Wednesday, 13 May 2009

Why Timber Frame...?




In Europe the building sector is responsible for half of all energy use and therefore half of all carbon consumption. According to Corrim (Consortium for Research on Renewable Industrial Materials) timber frame houses are better for the enviornment because wood uses less energy and that, results in fewer greenhouse gases than alternative materials. In a life-cycle assessment it found that timber-framing consumes less total energy during its 'lifetime'.The embodied energy of a building is the energy of a building that has been required to extract, process and manufacture it then to transport it to the building site. The highest embodied energy is found in metals. The middle range of materials such as bricks and blocks also require a lot of energy in their manufacture. The lowest embodied energy is in materials, such as building timber, that require only simple processing. Salvaged materials and local materials (straw bales rush matting and mud bricks) require virtually no energy.


What is the difference between timber frame walling and partial fill cavity walling?
The standard timber frame system consists of a waterproof membrane, sheathing board, structural timber frame, vapour barrier and inner lining of plasterboard. The insulation is placed between the timber frame uprights, and the thickness matches the size of the frame.Cavity walling consists of two masonry leafs side by side, a set distance apart but carefully tied together. The bottom of the cavity can drain and the inner leaf should remain entirely dry.However, Joseph Little, Project Architect with Bolton Construction writes in 'Construction Ireland' (Vol. 8, Issue 2) that we are reaching the limits of partial fill cavity walling. Wider and wider insulation batts are pushing the masonry leafs further apart and making wall ties longer, which has implications for the structure.Partial fill cavity walling is not a 'traditional' building method. On the contary, cavity walls have only being promoted in the Post-War era as a technollogical answer to problems posed with the externally rendered (un-insulated) 215mm solid block walls of the Inter-War years. Partial fill cavity walling belongs to a different era, an era when heating fuel was less expensive and the negative inpact of high CO2 emissions was unknown.Little goes on to write that since 1998, 250,000 new homes have been built to the older and less efficent building standards with inherently high CO2 emissions. Studies show that 8 out of 15 houses with partial fill cavity walling are under-performing and since there are too many variables influencing the effectiveness of partial fill cavity blocks, wet walls become a serious problem.8 out of 9 timber frame houses exceed the design requirement, because with timber frame systems, builders are able to compress quilt insulation, raising the insulation levels beyond what is legally required.Unstable rising oil and gas prices mean that energy efficent homes will be much sought after. It is not an exaggeration to suggest that houses built with interior methodologies and/or materials may, in the future, become worthless.
see link above for rest of article

Monday, 4 May 2009

03 Dec 2008 - Timber frame construction well placed for 2009

What does 2009 hold for the housebuilding industry and for the timber frame
sector, one of the UK's most glittering manufacturing success stories of recent
years?

Geoff Arnold, the incoming chairman of the UK Timber Frame Association (UKTFA),
says:

“Despite the depressed housing market, we are continuing to see relatively strong
demand for timber frame across all market sectors. We expect that the continue
next year. Obviously it will be sometime before we return to previous demand
levels; however, what is already clear is that the Code for Sustainable Homes
is still on everyone’s mind, and timber frame will be the build technology of
choice to deliver energy efficient homes both cost effectively and quickly.

"In 2009, the key for all developers will be market responsiveness. As funding
becomes available on a given scheme, whether in the public or private sector,
what will be critical is a developer’s ability to respond and build out the site.
Timber frame has proven time and time again that where build speed, performance
and energy efficiency are required, it can offer significant advantages over other
methods of build.

“We therefore see the percentage of timber frame homes increasing from 22.1%
in 2007 to well over 25% in 2009 even possibly achieving 30%. Furthermore, these
figures could be pushed higher as the Code for Sustainable Homes requirements
become better understood by developers. It is far easier to attain higher levels
of Code using timber frame than other build methods. Consumers then benefit from
a very comfortable home with small fuel bills.”

The UKTFA offers these top 10 tips to future-focused housebuilders and social
housing developers with an eye on the bottom line in 2009:

hit title above to view tips...

Timber Frame Will Triumph

"These economic advantages come at the same time as regulatory changes that will hit masonry construction hard, but that are negligible to us. New energy efficiency regulations for the construction of new homes being introduced from 1 April 2006 can be achieved with a simple, highly insulated timber frame solution that is already standard across our industry. This means more timber frame homes that use less energy to run, which is a benefit to home buyers that will continue to increase in importance as domestic fuel bills rise.


"We are nowhere near as dependent upon expensive fossil fuels. In fact, 77% of the energy used in the production of wood products in the UK comes from wood residues and recovered wood. Through recycling our own waste we help to keep our manufacturing costs and environmental impact as low as possible.


- Open panel timber frame construction in England and Wales currently costs GBP798 per square metre, compared to GBP799 per square metre for traditional brick and block construction;

- Timber frame construction (both open and closed panel systems) requires 20% fewer on-site labour days than masonry construction, and ensures a significantly faster construction period overall;

- Timber frame homes are weathertight in almost half the time, leading to important quality, efficiency and health and safety benefits;

- The cost of snagging timber frame homes is a third less than for brick and block homes;

- There are no high risks associated with open panel timber frame, compared to traditional construction which is perceived to be at high risk of price fluctuations, delays due to bad weather, lack of key trade skills, service installation faults, health and safety hazards, construction errors and other defects at handover;

- Multi-storey buildings favour modern methods of construction like timber frame because the costs of complying with stringent building regulations for high-rise buildings increase faster for brick and block construction than for off-site manufactured elements;

- Timber frame systems are also particularly suited to brownfield sites with poor soil conditions (sites that favour lighter buildings), and sites with restricted access.